References
Full reference list
Complete list of projects from Slovakia and abroad.
- NRS Nykopping AB – Oxelösund steelworks, boiler shutdown and piping replacement (Sweden)
- Volvo AB – fabrication and welding of stainless fuel tanks for individual clients (Sweden)
- AGS Norrköping AB – new boiler room and piping systems for Linköping hospital (Sweden)
- Nordic Power Service OY – shutdown works in the paper industry (boiler reconstruction and piping replacement in Finland)
- Foster Wheeler AB – shutdown works in paper mills in Oulu (Finland) and Piteå (Sweden)
- DURR GmbH – installation of pumps, fabrication and installation of piping, etc. (Sweden)
- Mexor AB – fabrication of collars for HVAC air filtration (Sweden)
- Oschatz GmbH – shutdown works at Scunthorpe Tata Steel steelworks (UK)
- Nordic Power Service OY – shutdown works in the paper industry (boiler reconstruction and piping replacement in Bulgaria)
- KADANT Lamort SAS – steam piping installation (Germany)
- Caverion Germany GmbH – reconstruction of boiler room and piping systems at Ludwigshafen hospital (Germany)
- Engie Germany GmbH – reconstruction of boiler room and piping systems at Stuttgart central station (Germany)
- Northvolt AB – fabrication and installation of piping systems for various media, steel structures, HVAC, and full A–Z service (Sweden)
- Firesafe AB – installation of fireproof insulation, sheet-metal cladding of installation openings, etc. (Sweden)
- Exmont Invest s.r.o / Eisenmann GmbH – prefabrication of stainless piping for Mercedes-Benz plant, approx. 4,000 inch (Kecskemét, Hungary)
- Exmont Invest s.r.o / DURR GmbH – prefabrication of stainless piping for Volkswagen plant, approx. 10,000 inch (Salzgitter, Germany)
- Sloving s.r.o – Slovnaft a.s. prefabrication and installation of piping during GR24 shutdown (Slovakia)
- Sloving s.r.o – Slovnaft a.s. prefabrication and installation of piping for the project: Tank drying
- Sloving s.r.o – Slovnaft a.s. installation of piping for BA111 boiler connection points
- HBH a.s. – reconstruction of the Pasienky swimming pool
- MENERT s.r.o, Križovany nad Dudváhom 2025 – main contractor for cultural house reconstruction
- MAKS-D s.r.o / Duslo a.s, KDII tertiary reduction 2025 – main contractor for construction works
- MAKS-D s.r.o / Duslo a.s, spherical storage tanks replacement 2025–2027 – main contractor for construction works
- Sloving s.r.o / Slovnaft a.s, foaming pipeline replacement 2026